Energy Department terminates loan for Grain Belt Express

Department of Energy 180x720.jpg

The Department of Energy has scrapped a nearly $5 billion loan program for the Grain Belt Express, a nearly 600-mile-long electric line for wind & solar projects out of the Midwest.

The Department says it was a project “rushed out the door” in the final days of the Biden Administration. It also says the conditions necessary to issue the $4.9 billion loan are unlikely to be met, and it is not critical for the federal government to play a role in the project.

The Grain Belt Express was intended to connect wind and solar facilities across Kansas and Missouri. Senator Josh Hawley previously said the 600-mile project would put farmers in danger of losing land.

Related Stories
Prepare for acute UAN risk and a brief urea shock; maintain steady ammonia and phosphate plans, and monitor potash basis on the coasts.
“A government shutdown impacts all Americans and has serious consequences, including for farmers. It just adds additional uncertainty, disrupts critical services.”
Consumer demand for regional food systems is strong, but the challenge lies in scaling production and infrastructure to meet that growing need.
Dave Kestel, a farmer from Will County and member of the Illinois Farm Bureau, joins us to share a boots-on-the-ground update on the 2025 corn harvest.
American Coalition for Ethanol’s Ron Lamberty shares the significance of California’s approval, opening up the country’s largest gasoline market to a cleaner-burning, often lower-cost fuel option.