The Army Corps of Engineers is prepping the Missouri River for the winter season.
Releases at Gavins Point Dam will be reduced by 1,500 cubic feet per second. Releases are currently at 32,000.
The reduction is slightly higher than last winter, which was at the minimum rate due to drought.
The Army Corps advises intake operators in the lower river to take appropriate measures so they can maintain access to water.
Last month’s runoff along the country’s longest river above Sioux City was 1.5 million acres feet, 124 percent of normal.
Related Stories
Kansas Congressman Derek Schmidt joins us to discuss House passage of the Farm Bill, its potential impact on farm profitability and stability, key policy compromises, and the outlook for Senate consideration.
The farm bill is still moving, but the toughest amendment fights were pushed into today’s session. ASA President Scott Metzger joins us to discuss the risks of tariff actions on soybean exports, concerns over trade policy and production costs, and the importance of Farm Bill updates.
A more independent UAE could add long-term pressure and volatility to energy markets, affecting fuel and fertilizer costs.
Clean power growth remains strong, but slower deal-making could affect future rural energy and land-use opportunities.
Higher biofuel mandates boost long-term crop demand, but a tighter D4 market may pressure biofuel feedstocks and pose new soybean oil demand risks.